Internal refit works of the lower ground floor, mezzanine and first floor on listed building
123 Pall Mall, SW1Y 5EA
Internal refit works of the lower ground floor, mezzanine and first floor on listed building
Home > Case Studies > Building demolition, erection of multiple storey building to create 5 flats
Erection of multi-storey buildings to provide five flats.
Demolition of existing building and erection of part two, part three storey building to provide 4 x 2-bedroom and 1 x 3-bedroom flats with associated landscaping, cycle and refuse storage.
4D Planning were instructed to assist and advise the architect to obtain planning permission for a new residential development following the demolition of the existing building. 4D Planning advised the client and architect on the proposed drawings and design. 4D Planning also produced the planning and design and access statements and liaised with the Council following submission of the application. The application was GRANTED planning permission by Wandsworth Council.
Get a fully transparent and competitive quote - no hidden fees
Get your full breakdown, all inclusive fixed fee quote now
123 Pall Mall, SW1Y 5EA
Internal refit works of the lower ground floor, mezzanine and first floor on listed building
18 Cope Place W8 6AA
Side extension to the rear of the property Kensington and Chelsea.
120A Camden Street, NW1 0HY
Single storey rear extension, front staircase replacement, installation of new entrance within lightwell
224b Higham Hill Road, London, E17 5RQ
Construction of dormer roof extension to main rear roof, together with installation of two roof-lights to front roof.